Voltasol ESS 5.5kW Hybrid Inverter Charger 48V | Pylontech Compatible
- ✔ Premium Quality Materials
- ✔ Quality Checked Before Dispatch
- ✔ Secure Payments
- ✔ Dedicated Customer Support
Fast Shipping
Quick dispatch and reliable delivery.
Secure Checkout
Your payments are protected and encrypted.
Easy Returns
Hassle-free return process.
Trusted Quality
Premium products loved by customers.
Don't Forget To Explore More From This Collection
Customers often buy these together to complete their project.
Description
The Voltasol ESS 5500W is a single-phase hybrid inverter and battery charger built for energy storage systems running Pylontech lithium batteries. It delivers 5.5kW continuous output with a 100A solar and AC charger, and its BMS communication is compatible with Pylontech US3000C, US5000C and legacy US2000C modules. An energy meter and Modbus card come pre-installed.
Key features of this 48V hybrid inverter
- Continuous output, 5500W single-phase, higher than the 3600W limit found on many comparable hybrid inverters
- Battery compatibility, Pylontech US3000C, US5000C, legacy US2000C
- Charger, 100A AC and solar charger
- Output waveform, pure sine wave
- Export control, adjustable from 0W to 5500W
- Communications, USB, RS232, Modbus, SNMP, GPRS, Wi-Fi
Operating modes
The inverter can run off-grid with the grid as a backup source, or in hybrid mode where the inverter and grid supply AC loads together. Export to grid is adjustable across the full 0W to 5500W range, and a split-supply mode lets AC loads run from the grid while critical loads run off-grid, within the combined 5.5kW capacity. A timer charging function schedules AC charging from the grid during low-tariff periods.
Applications
Suited to residential energy storage systems built around Pylontech lithium batteries, including self-consumption setups with higher continuous load demands, on-grid installations with battery backup and export control, and off-grid residential or agricultural single-phase systems.
Installation notes
Installation must be carried out by a qualified electrician or MCS-accredited solar installer. Battery systems must comply with BS EN 62619 and local building regulations, with correct cable sizing, fusing, isolators and earthing in place. Grid connection requires G98 notification or a G99 application. This is not a DIY installation product.
What's included
- Energy meter and Modbus card, pre-installed
- BMS communication cards
Return policy
Our goal is for every customer to be totally satisfied with their purchase. If this isn't the case, let us know and we'll do our best to work with you to make it right.
Shipping
We will work quickly to ship your order as soon as possible. Once your order has shipped, you will receive an email with further information. Delivery times vary depending on your location.
Manufacturing
Our products are manufactured both locally and globally. We carefully select our manufacturing partners to ensure our products are high quality and a fair value.